Yes. We now have enough primary-source material to start the actual Fort Worth Development Accountability Ledger rather than continuing to talk about it abstractly.

Fort Worth Development Accountability Ledger — 2026

One important correction from our earlier discussion: USGS released Annual NLCD Collection 1.2 on June 30, 2026, extending annual land-cover and land-cover-change data through 2025. That gives us a legitimate scientific baseline for measuring what has happened to the landscape.

1. What the city's own records tell us

Fort Worth's 2025 Development Activity Report recorded 1,278 new non-residential commercial permits, up 8.3% from 1,172 in 2024. More strikingly, the reported valuation of those new non-residential commercial permits increased from approximately $2.1 billion in 2024 to $5.4 billion in 2025—a 151% increase. These figures exclude multifamily housing.

That is a very substantial acceleration in commercial construction.

Selected projects documented by Fort Worth

Project Size Type What we can establish
QTS FTW1 DC2 471,876 sq. ft. Data center New construction; 2024 permit valuation $160.2M
Marlowe West 451,409 sq. ft. / 432 units Apartments New multifamily construction
Speedway 3 Industrial 702,755 sq. ft. Industrial/warehouse New shell buildings
Wellington Townhomes 330,910 sq. ft. / 150 units Residential New townhomes
Conagra 1,002,287 sq. ft. Warehouse Existing warehouse remodel
QTS FTW1 DH1 & 5 28,000 sq. ft. Data center $16.3M remodel

These are actual entries in Fort Worth's development records—not projections from social media or development websites.


2. And this is where your "everything is becoming concrete" observation gets interesting

The city recorded 5.4 billion dollars of new non-residential commercial permit valuation in 2025 alone.

That doesn't mean $5.4 billion of land was paved over.

It means the value of permitted new commercial construction reached that level.

That's an important distinction.

But it demonstrates the sheer magnitude of construction occurring.

And Fort Worth continues publishing monthly Development Activity Reports through 2026, allowing us to track the expansion rather than relying on an old annual snapshot.


3. Now let's bring in the satellite evidence

This is where we can finally measure the landscape itself.

The USGS Annual NLCD provides annual land-cover information at 30-meter resolution and includes a specific Land Cover Change product showing the transition from one land-cover class to another from year to year.

That means we can distinguish, for example:

Forest → Developed

from:

Grassland → Developed

from:

Agriculture → Developed

rather than simply saying "Fort Worth lost green space."

That's much more defensible.


4. Our baseline should be 2015

I recommend using:

2015

as the baseline,

then measuring:

2020

2023

2025

and treating:

2026–2030

as the development pipeline rather than pretending future projects are already built.

Why?

Because USGS's annual dataset gives us actual observed land cover through 2025.

For 2026 onward, we switch to planning and permitting records.

That creates a clean distinction:

PAST = measured satellite change

PRESENT = permits/construction

FUTURE = approved/proposed projects


5. Here's the ledger we're building

LAND

Acres converted from natural/agricultural land → developed

TREES

Woodland/forest converted

GRASSLAND

Grassland/pasture converted

AGRICULTURE

Agricultural land converted

IMPERVIOUS SURFACE

Roads + parking + roofs + concrete

HOUSING

New units

WAREHOUSES

Square footage

DATA CENTERS

Square footage + MW

WATER

Gallons/day and gallons/year where documented

ELECTRICITY

MW requested / approved / connected

TAX INCENTIVES

Actual approved incentives

JOBS

Permanent employment commitments

PUBLIC INFRASTRUCTURE

Road, water, sewer, drainage and electrical requirements

CONSERVATION

Land actually protected


6. I also want to make one major change to our earlier approach

We should not lump apartments, warehouses and data centers into one "development" number.

They affect the community differently.

For example:

Apartment development

Main concerns:

population + water + wastewater + traffic + schools + public services

Warehouse

Main concerns:

land + truck traffic + roads + pavement + drainage + employment

Data center

Main concerns:

electricity + substations + cooling + water + backup generation + fiber + relatively low permanent employment

That distinction will make our final report much stronger.


7. The data-center portion is already becoming measurable

Fort Worth's own data-center policy page confirms that the city is actively developing regulations addressing these facilities. In 2026, the city presented proposed regulations, held a public open house, and advanced zoning-policy discussions.

So this isn't merely an environmental debate anymore.

It's becoming an actual municipal planning issue.


8. Here's the question I want the final report to answer

Not:

"Are data centers bad?"

Not:

"Is development bad?"

Instead:

"What is Fort Worth receiving in exchange for the land, water, electricity, infrastructure and tax incentives consumed by each major development?"

That's the accountability question.

For example:

PROJECT A

$1 billion investment
500 acres
500 jobs
X gallons water
X MW electricity
$X incentive
X acres preserved

versus:

PROJECT B

$1 billion investment
100 acres
50 jobs
X gallons water
200 MW electricity
$X incentive
zero conservation

Those projects have very different public consequences, even though both are "one-billion-dollar developments."


🌳 And your original concern about the landscape is going to be the most visually powerful part

We can ultimately produce a 2015 → 2025 land-conversion map showing:

GREEN — natural/open land remaining

BROWN — agriculture

DARK GREEN — woodland

GRAY — developed/impervious land

and then overlay:

πŸ”΄ warehouses
🟣 data centers
🟠 major apartment developments
πŸ”΅ roads/infrastructure
🟒 protected land

The USGS data is specifically designed for this kind of land-change analysis.


One thing I don't want to do

I don't want to give you a dramatic-looking number such as:

"Fort Worth destroyed 40,000 acres of forest."

unless the GIS analysis actually produces that number.

The USGS data can tell us exactly what changed, but we need to process the Fort Worth boundary against the annual raster data to calculate the acreage.

That is the next technical step.

And that's the one I recommend doing.

2015 → 2020 → 2025

Fort Worth boundary

Forest / grassland / agriculture / developed

Then calculate:

How many acres changed from each natural/agricultural category into developed land?

Once we have that number, we can put the apartments, warehouses and data centers on top of the actual land-change evidence.

That will give you the answer to the question you've been asking from the beginning:

"What happened to the land we used to have?"

 
 
yes please
 

Yes. I’ve now moved this from the general discussion into a documented Fort Worth development baseline. The most important thing I can tell you is that the evidence supports your observation of rapid physical change, but we need to distinguish measured land conversion from future development proposals.

🌎 Fort Worth: What the evidence shows

The U.S. Geological Survey's Annual NLCD now provides annual land-cover and land-change data from 1985 through 2025, at 30-meter resolution. It specifically records transitions such as one land-cover class changing into another.

USGS even uses the northern Dallas–Fort Worth area as an example, showing the expansion of developed/urban land from 1985 through 2023.

So the basic observation:

"The open land is disappearing and being replaced by development."

is supported by satellite-based evidence.

But here's the important part:

I am not going to manufacture an acreage figure for Fort Worth until the GIS data are actually clipped to the Fort Worth boundary and calculated.

That is the next step needed for a scientifically defensible number.


πŸ—οΈ Meanwhile, Fort Worth's development records show what is happening on the ground

The city's Development Activity Committee maintains monthly reports, including January through June 2026.

And these aren't tiny projects.

For example, recent city records include:

🏭 Warehouses / industrial

Alliance Center North — Building 3

New shell warehouse

$20.45 million


First Industrial Fossil Creek

New office/warehouse shell

$7.38 million

 

And earlier city records show projects such as:

ACN8 & ACN9

New commercial warehouse buildings:

$46.7 million

 


🏒 Apartments are being added simultaneously

The same city development records show:

Presidio III Apartments

231 units

and

Standard at River District

293 units

with a parking garage.

 

Another example is Jefferson Ederville, a 398-unit apartment development in east Fort Worth, scheduled to open in winter 2026.

So what you're seeing isn't simply warehouses replacing open land.

It's:

WAREHOUSES + APARTMENTS + DATA CENTERS + ROADS + UTILITIES

all occurring as part of the same broader growth process.


πŸ’» And then there is the extraordinary data-center component

Fort Worth currently reports:

4 existing data-center developments

containing:

10 individual buildings

with a combined footprint exceeding:

3 million square feet

The facilities range from roughly 209,000 square feet to a 1.5-million-square-foot campus. The city says the first Fort Worth data center dates to 2000, with the most recent completed construction in 2025.

And the pipeline isn't finished.

Fort Worth currently identifies:

  • 1 additional facility under construction
  • 4 additional projects proposed inside city limits
  • 2 additional projects proposed in the city's extraterritorial jurisdiction

 

That's why the data-center question deserves to be treated separately from ordinary commercial construction.


🌳 Here's the number that puts the land question into perspective

Fort Worth's planning documents previously reported more than 66,000 acres of vacant developable land based on NCTCOG's 2015 estimates.

An earlier city economic-development document put the figure at approximately 70,661 acres using an older NCTCOG dataset.

But—and this is critical—

"Vacant developable land" does NOT mean 66,000 acres of forest.

It can include pasture, grassland, previously disturbed property and other categories.

That's exactly why we're going to use USGS land-cover data to determine what the land actually was before development.


πŸ”¬ Here's the calculation we need

For each year:

2015

Forest → ?

Grassland → ?

Agriculture → ?

Developed → ?

2020

Forest → ?

Grassland → ?

Agriculture → ?

Developed → ?

2025

Forest → ?

Grassland → ?

Agriculture → ?

Developed → ?

Then:

2015 → 2025

we calculate:

Forest → Developed

Grassland → Developed

Agriculture → Developed

Wetland → Developed

Other natural → Developed

The USGS Land Cover Change product is specifically designed to identify those transitions.


🚨 There's another measurement I want to add

Your description of the landscape being covered by "concrete" is actually something we can measure more precisely.

USGS has a separate:

Fractional Impervious Surface

product.

It measures the percentage of a location covered by impervious surfaces such as buildings, pavement and other surfaces that prevent water from infiltrating normally. The Annual NLCD product suite includes both fractional impervious surface and an impervious descriptor.

So our eventual report shouldn't merely say:

"X acres were developed."

It should also ask:

"How much of that land became effectively impervious?"

That's much closer to what you're describing when you look at a former grassy or wooded landscape and see roofs, parking lots and concrete.


πŸ’§ And then we overlay the water issue

Fort Worth is already considering specific regulations for data centers.

The city's current policy page says the proposed regulations address issues including water, wastewater, noise, zoning and infrastructure. The city is also moving through the legal process for a possible data-center moratorium, with a tentative February 16, 2027 council vote if the required steps are completed.

That is significant.

It means the city itself recognizes that data centers create issues requiring special consideration, rather than simply treating them like an ordinary office building.


🧭 What we know — and what we don't

Question Current evidence
Is DFW becoming more developed? YES — satellite evidence
Has Fort Worth experienced major development? YES — city permit records
Are warehouses being built? YES
Are large apartment developments being built? YES
Are huge data centers being built/proposed? YES
Does Fort Worth still have substantial undeveloped land? YES
Is all that undeveloped land forest? NO — cannot assume that
Are data centers a significant water/electricity issue? YES, depending on facility design
Is every proposed project actually going to be built? NO — proposals must be separated from completed projects
Do we yet have an exact 2015–2025 Fort Worth forest-loss acreage? Not yet calculated

That last line is important.


πŸ”₯ And here's where I think this investigation gets really interesting

The question isn't simply:

"Are they building too much?"

We can ask something much harder:

"Is Fort Worth's infrastructure keeping pace with the physical expansion of the city?"

Because imagine simultaneously increasing:

🏠 population

🏒 apartments

🏭 warehouses

πŸ’» data centers

πŸš— traffic

πŸ’§ water demand

⚑ electricity demand

while consuming:

🌳 open land

🌾 agricultural land

🌲 woodland

and increasing:

πŸ›£οΈ roads

🚰 water infrastructure

⚑ transmission infrastructure

🌧️ stormwater infrastructure

That's the real system we're investigating.


And I think we should give this investigation a name

THE FORT WORTH 2050 LAND & RESOURCE ACCOUNTABILITY PROJECT

"What are we building—and what are we giving up?"

The final report should have four parts:

PART I — THE LAND

2015 → 2025 satellite-measured conversion.

PART II — THE BUILDINGS

Apartments, warehouses, industrial projects and data centers.

PART III — THE RESOURCES

Water, electricity, roads, wastewater and stormwater.

PART IV — THE FUTURE

Approved and proposed 2026–2030 development.

And every number will carry a label:

🟒 VERIFIED

🟑 REPORTED

πŸ”΄ UNKNOWN

That last category is important. If the city or developer hasn't disclosed something, we should say so.

That way, the finished report isn't propaganda for or against development.

It becomes a public-accountability document based on government records, satellite observations and disclosed numbers.

 
Ad
 
 
ChatGPT, you made my day, thank you God Bless
 

John, that genuinely means a lot. Thank you. πŸ™

And I appreciate the way you're approaching this: ask the hard questions, but then demand evidence. That's exactly how we'll keep the Fort Worth development investigation credible.

We'll keep separating what is known, what is estimated, and what remains unknown—especially when we're dealing with water, electricity, land use, tax incentives, and data centers.

God bless you too, my friend. πŸ™πŸ‡ΊπŸ‡Έ 

 

 
Data Centers require unsurmountable amounts of water. Please elaborate on this.
 

Absolutely. The concern about data centers and water consumption is legitimate, but the scale depends heavily on the type of facility, its cooling technology, climate, and whether the water is potable, reclaimed, or recycled.

Why do data centers need so much water?

The primary reason is heat.

Modern data centers contain thousands of servers running continuously. Those servers turn a large portion of their electricity into heat. That heat must be removed 24 hours a day, 365 days a year.

One common method is evaporative cooling:

Electricity → Servers → Heat → Cooling system → Water evaporation

Water absorbs heat extremely effectively. In cooling towers, some of the water is deliberately evaporated into the atmosphere. That water has to be replaced.

6

How much water are we talking about?

This is where some of the claims circulating online become misleading.

A large hyperscale data center can consume hundreds of thousands of gallons of water per day, and facilities in the largest installations can reach millions of gallons per day under certain conditions.

But there is an important distinction:

  • Water withdrawal = water taken from a source.
  • Water consumption = water that is actually lost from the local water system, primarily through evaporation.
  • Water discharge = water returned to the environment or treatment system.

Those numbers can be dramatically different.

AI makes the issue more important

Artificial intelligence is adding another dimension.

AI systems require enormous amounts of computing power, particularly during the training of large models and when millions of users are simultaneously generating responses.

More computing → more electricity → more heat → more cooling.

Consequently, the rapid expansion of AI infrastructure has increased interest in the water footprint of computing.

There is also an indirect water footprint.

Electricity itself can require water. Some power plants use water for cooling, meaning a data center can have:

Direct water consumption
→ cooling the data center

plus

Indirect water consumption
→ producing the electricity that powers it.

So the total water footprint can be considerably larger than the water consumed at the data-center property itself.


The Texas problem is particularly interesting

Texas is becoming one of the major locations for data-center development because of its:

  • abundant land
  • large electricity market
  • growing renewable-energy capacity
  • business environment
  • proximity to major population centers
  • expanding AI infrastructure

But Texas also experiences periodic drought and extreme heat.

That creates a potential conflict:

The hottest weather is often when cooling systems need the most water, while drought is when communities most need to conserve water.

This is one reason the location of a data center matters enormously.

A facility using evaporative cooling in a hot, dry region can have a substantially different water impact from a similar facility using a closed-loop or air-cooled system in a cooler, wetter region.


But here's the important part

It would be incorrect to say:

"Every data center requires an unsurmountable amount of water."

That's not technically accurate.

There are technologies that can dramatically reduce direct water consumption.

1. Air cooling

Instead of evaporating water, a facility can use outside air and mechanical cooling.

Advantage: very little direct water consumption.

Disadvantage: can require more electricity, particularly in hot climates.

2. Closed-loop liquid cooling

This is becoming particularly important for AI.

Instead of continually consuming fresh water, liquid circulates through a closed system:

Server → coolant → heat exchanger → cooling system → server

The same coolant can circulate repeatedly.

This can substantially reduce ongoing water consumption.

3. Reclaimed wastewater

Instead of using drinking-water supplies, facilities can use treated wastewater.

That's potentially a much better solution where infrastructure exists.

The water isn't suitable for drinking, but it can potentially be treated to the quality necessary for industrial cooling.

4. Dry cooling

Some facilities can use cooling systems that don't rely heavily on evaporation.

Again, the tradeoff can be higher electricity consumption and potentially higher costs, especially during extreme heat.


There's another issue people sometimes overlook

The water isn't necessarily coming from a giant tank sitting next to the servers.

A data center may be connected to a municipal water system.

That means a new facility can potentially become a major industrial customer of the same water infrastructure serving:

  • households
  • restaurants
  • businesses
  • hospitals
  • schools
  • agriculture

This raises a legitimate public-policy question:

Should a community's limited water resources be committed to industrial computing facilities?

And that's not an anti-technology question.

It's a resource-allocation question.

A community should be able to ask:

  1. How many gallons will the facility withdraw?
  2. How many gallons will actually be consumed?
  3. Where does the water come from?
  4. Is it potable drinking water?
  5. Can reclaimed wastewater be used instead?
  6. What happens during drought restrictions?
  7. Who pays for water-treatment and pipeline expansion?
  8. What happens to surrounding wells and aquifers?
  9. How much water will be consumed during the hottest periods?
  10. Will the company receive preferential access to water?
  11. What happens if multiple data centers are built in the same area?
  12. What is the cumulative impact?

That last question is extremely important.

One data center may be manageable.

Twenty, thirty, or fifty facilities concentrated in the same region could produce an entirely different infrastructure problem.


And there is a misconception worth correcting

You may hear a statement such as:

"AI uses X bottles of water every time someone asks ChatGPT a question."

Those claims should be treated cautiously.

Water consumption varies enormously depending upon:

  • model being used
  • data-center location
  • weather
  • cooling technology
  • server utilization
  • electricity source
  • time of day
  • efficiency of the facility

There isn't one universal "water cost" for an AI query.

The facility-level numbers are much more useful for public policy than trying to assign a fixed number of ounces of water to every individual AI request.


The bigger picture

The real issue isn't simply:

"Do data centers use water?"

They absolutely can.

The more important question is:

"How much water will this particular data center consume, where will it come from, and what happens to the community's water supply when many facilities are built?"

That's where the debate becomes meaningful.

And if you're looking specifically at Texas and the Fort Worth/Dallas area, the issue becomes particularly relevant because the region is experiencing rapid data-center growth while simultaneously having to plan for long-term water and electricity demand.

If you'd like, I can take this one step further and research the actual water consumption of data centers being built around Fort Worth/Dallas, identify the major facilities, and compare their projected water usage with the water consumption of local cities and households. That would put the issue into concrete numbers rather than general claims.

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Yes. We now have enough primary-source material to start the actual Fort Worth Development Accountability Ledger rather than continuing to talk about it abstractly.

Fort Worth Development Accountability Ledger — 2026

One important correction from our earlier discussion: USGS released Annual NLCD Collection 1.2 on June 30, 2026, extending annual land-cover and land-cover-change data through 2025. That gives us a legitimate scientific baseline for measuring what has happened to the landscape.

1. What the city's own records tell us

Fort Worth's 2025 Development Activity Report recorded 1,278 new non-residential commercial permits, up 8.3% from 1,172 in 2024. More strikingly, the reported valuation of those new non-residential commercial permits increased from approximately $2.1 billion in 2024 to $5.4 billion in 2025—a 151% increase. These figures exclude multifamily housing.

That is a very substantial acceleration in commercial construction.

Selected projects documented by Fort Worth

Project Size Type What we can establish
QTS FTW1 DC2 471,876 sq. ft. Data center New construction; 2024 permit valuation $160.2M
Marlowe West 451,409 sq. ft. / 432 units Apartments New multifamily construction
Speedway 3 Industrial 702,755 sq. ft. Industrial/warehouse New shell buildings
Wellington Townhomes 330,910 sq. ft. / 150 units Residential New townhomes
Conagra 1,002,287 sq. ft. Warehouse Existing warehouse remodel
QTS FTW1 DH1 & 5 28,000 sq. ft. Data center $16.3M remodel

These are actual entries in Fort Worth's development records—not projections from social media or development websites.


2. And this is where your "everything is becoming concrete" observation gets interesting

The city recorded 5.4 billion dollars of new non-residential commercial permit valuation in 2025 alone.

That doesn't mean $5.4 billion of land was paved over.

It means the value of permitted new commercial construction reached that level.

That's an important distinction.

But it demonstrates the sheer magnitude of construction occurring.

And Fort Worth continues publishing monthly Development Activity Reports through 2026, allowing us to track the expansion rather than relying on an old annual snapshot.


3. Now let's bring in the satellite evidence

This is where we can finally measure the landscape itself.

The USGS Annual NLCD provides annual land-cover information at 30-meter resolution and includes a specific Land Cover Change product showing the transition from one land-cover class to another from year to year.

That means we can distinguish, for example:

Forest → Developed

from:

Grassland → Developed

from:

Agriculture → Developed

rather than simply saying "Fort Worth lost green space."

That's much more defensible.


4. Our baseline should be 2015

I recommend using:

2015

as the baseline,

then measuring:

2020

2023

2025

and treating:

2026–2030

as the development pipeline rather than pretending future projects are already built.

Why?

Because USGS's annual dataset gives us actual observed land cover through 2025.

For 2026 onward, we switch to planning and permitting records.

That creates a clean distinction:

PAST = measured satellite change

PRESENT = permits/construction

FUTURE = approved/proposed projects


5. Here's the ledger we're building

LAND

Acres converted from natural/agricultural land → developed

TREES

Woodland/forest converted

GRASSLAND

Grassland/pasture converted

AGRICULTURE

Agricultural land converted

IMPERVIOUS SURFACE

Roads + parking + roofs + concrete

HOUSING

New units

WAREHOUSES

Square footage

DATA CENTERS

Square footage + MW

WATER

Gallons/day and gallons/year where documented

ELECTRICITY

MW requested / approved / connected

TAX INCENTIVES

Actual approved incentives

JOBS

Permanent employment commitments

PUBLIC INFRASTRUCTURE

Road, water, sewer, drainage and electrical requirements

CONSERVATION

Land actually protected


6. I also want to make one major change to our earlier approach

We should not lump apartments, warehouses and data centers into one "development" number.

They affect the community differently.

For example:

Apartment development

Main concerns:

population + water + wastewater + traffic + schools + public services

Warehouse

Main concerns:

land + truck traffic + roads + pavement + drainage + employment

Data center

Main concerns:

electricity + substations + cooling + water + backup generation + fiber + relatively low permanent employment

That distinction will make our final report much stronger.


7. The data-center portion is already becoming measurable

Fort Worth's own data-center policy page confirms that the city is actively developing regulations addressing these facilities. In 2026, the city presented proposed regulations, held a public open house, and advanced zoning-policy discussions.

So this isn't merely an environmental debate anymore.

It's becoming an actual municipal planning issue.


8. Here's the question I want the final report to answer

Not:

"Are data centers bad?"

Not:

"Is development bad?"

Instead:

"What is Fort Worth receiving in exchange for the land, water, electricity, infrastructure and tax incentives consumed by each major development?"

That's the accountability question.

For example:

PROJECT A

$1 billion investment
500 acres
500 jobs
X gallons water
X MW electricity
$X incentive
X acres preserved

versus:

PROJECT B

$1 billion investment
100 acres
50 jobs
X gallons water
200 MW electricity
$X incentive
zero conservation

Those projects have very different public consequences, even though both are "one-billion-dollar developments."


🌳 And your original concern about the landscape is going to be the most visually powerful part

We can ultimately produce a 2015 → 2025 land-conversion map showing:

GREEN — natural/open land remaining

BROWN — agriculture

DARK GREEN — woodland

GRAY — developed/impervious land

and then overlay:

πŸ”΄ warehouses
🟣 data centers
🟠 major apartment developments
πŸ”΅ roads/infrastructure
🟒 protected land

The USGS data is specifically designed for this kind of land-change analysis.


One thing I don't want to do

I don't want to give you a dramatic-looking number such as:

"Fort Worth destroyed 40,000 acres of forest."

unless the GIS analysis actually produces that number.

The USGS data can tell us exactly what changed, but we need to process the Fort Worth boundary against the annual raster data to calculate the acreage.

That is the next technical step.

And that's the one I recommend doing.

2015 → 2020 → 2025

Fort Worth boundary

Forest / grassland / agriculture / developed

Then calculate:

How many acres changed from each natural/agricultural category into developed land?

Once we have that number, we can put the apartments, warehouses and data centers on top of the actual land-change evidence.

That will give you the answer to the question you've been asking from the beginning:

"What happened to the land we used to have?"

 
 
yes please
 

Yes. I’ve now moved this from the general discussion into a documented Fort Worth development baseline. The most important thing I can tell you is that the evidence supports your observation of rapid physical change, but we need to distinguish measured land conversion from future development proposals.

🌎 Fort Worth: What the evidence shows

The U.S. Geological Survey's Annual NLCD now provides annual land-cover and land-change data from 1985 through 2025, at 30-meter resolution. It specifically records transitions such as one land-cover class changing into another.

USGS even uses the northern Dallas–Fort Worth area as an example, showing the expansion of developed/urban land from 1985 through 2023.

So the basic observation:

"The open land is disappearing and being replaced by development."

is supported by satellite-based evidence.

But here's the important part:

I am not going to manufacture an acreage figure for Fort Worth until the GIS data are actually clipped to the Fort Worth boundary and calculated.

That is the next step needed for a scientifically defensible number.


πŸ—οΈ Meanwhile, Fort Worth's development records show what is happening on the ground

The city's Development Activity Committee maintains monthly reports, including January through June 2026.

And these aren't tiny projects.

For example, recent city records include:

🏭 Warehouses / industrial

Alliance Center North — Building 3

New shell warehouse

$20.45 million


First Industrial Fossil Creek

New office/warehouse shell

$7.38 million

 

And earlier city records show projects such as:

ACN8 & ACN9

New commercial warehouse buildings:

$46.7 million

 


🏒 Apartments are being added simultaneously

The same city development records show:

Presidio III Apartments

231 units

and

Standard at River District

293 units

with a parking garage.

 

Another example is Jefferson Ederville, a 398-unit apartment development in east Fort Worth, scheduled to open in winter 2026.

So what you're seeing isn't simply warehouses replacing open land.

It's:

WAREHOUSES + APARTMENTS + DATA CENTERS + ROADS + UTILITIES

all occurring as part of the same broader growth process.


πŸ’» And then there is the extraordinary data-center component

Fort Worth currently reports:

4 existing data-center developments

containing:

10 individual buildings

with a combined footprint exceeding:

3 million square feet

The facilities range from roughly 209,000 square feet to a 1.5-million-square-foot campus. The city says the first Fort Worth data center dates to 2000, with the most recent completed construction in 2025.

And the pipeline isn't finished.

Fort Worth currently identifies:

  • 1 additional facility under construction
  • 4 additional projects proposed inside city limits
  • 2 additional projects proposed in the city's extraterritorial jurisdiction

 

That's why the data-center question deserves to be treated separately from ordinary commercial construction.


🌳 Here's the number that puts the land question into perspective

Fort Worth's planning documents previously reported more than 66,000 acres of vacant developable land based on NCTCOG's 2015 estimates.

An earlier city economic-development document put the figure at approximately 70,661 acres using an older NCTCOG dataset.

But—and this is critical—

"Vacant developable land" does NOT mean 66,000 acres of forest.

It can include pasture, grassland, previously disturbed property and other categories.

That's exactly why we're going to use USGS land-cover data to determine what the land actually was before development.


πŸ”¬ Here's the calculation we need

For each year:

2015

Forest → ?

Grassland → ?

Agriculture → ?

Developed → ?

2020

Forest → ?

Grassland → ?

Agriculture → ?

Developed → ?

2025

Forest → ?

Grassland → ?

Agriculture → ?

Developed → ?

Then:

2015 → 2025

we calculate:

Forest → Developed

Grassland → Developed

Agriculture → Developed

Wetland → Developed

Other natural → Developed

The USGS Land Cover Change product is specifically designed to identify those transitions.


🚨 There's another measurement I want to add

Your description of the landscape being covered by "concrete" is actually something we can measure more precisely.

USGS has a separate:

Fractional Impervious Surface

product.

It measures the percentage of a location covered by impervious surfaces such as buildings, pavement and other surfaces that prevent water from infiltrating normally. The Annual NLCD product suite includes both fractional impervious surface and an impervious descriptor.

So our eventual report shouldn't merely say:

"X acres were developed."

It should also ask:

"How much of that land became effectively impervious?"

That's much closer to what you're describing when you look at a former grassy or wooded landscape and see roofs, parking lots and concrete.


πŸ’§ And then we overlay the water issue

Fort Worth is already considering specific regulations for data centers.

The city's current policy page says the proposed regulations address issues including water, wastewater, noise, zoning and infrastructure. The city is also moving through the legal process for a possible data-center moratorium, with a tentative February 16, 2027 council vote if the required steps are completed.

That is significant.

It means the city itself recognizes that data centers create issues requiring special consideration, rather than simply treating them like an ordinary office building.


🧭 What we know — and what we don't

Question Current evidence
Is DFW becoming more developed? YES — satellite evidence
Has Fort Worth experienced major development? YES — city permit records
Are warehouses being built? YES
Are large apartment developments being built? YES
Are huge data centers being built/proposed? YES
Does Fort Worth still have substantial undeveloped land? YES
Is all that undeveloped land forest? NO — cannot assume that
Are data centers a significant water/electricity issue? YES, depending on facility design
Is every proposed project actually going to be built? NO — proposals must be separated from completed projects
Do we yet have an exact 2015–2025 Fort Worth forest-loss acreage? Not yet calculated

That last line is important.


πŸ”₯ And here's where I think this investigation gets really interesting

The question isn't simply:

"Are they building too much?"

We can ask something much harder:

"Is Fort Worth's infrastructure keeping pace with the physical expansion of the city?"

Because imagine simultaneously increasing:

🏠 population

🏒 apartments

🏭 warehouses

πŸ’» data centers

πŸš— traffic

πŸ’§ water demand

⚑ electricity demand

while consuming:

🌳 open land

🌾 agricultural land

🌲 woodland

and increasing:

πŸ›£οΈ roads

🚰 water infrastructure

⚑ transmission infrastructure

🌧️ stormwater infrastructure

That's the real system we're investigating.


And I think we should give this investigation a name

THE FORT WORTH 2050 LAND & RESOURCE ACCOUNTABILITY PROJECT

"What are we building—and what are we giving up?"

The final report should have four parts:

PART I — THE LAND

2015 → 2025 satellite-measured conversion.

PART II — THE BUILDINGS

Apartments, warehouses, industrial projects and data centers.

PART III — THE RESOURCES

Water, electricity, roads, wastewater and stormwater.

PART IV — THE FUTURE

Approved and proposed 2026–2030 development.

And every number will carry a label:

🟒 VERIFIED

🟑 REPORTED

πŸ”΄ UNKNOWN

That last category is important. If the city or developer hasn't disclosed something, we should say so.

That way, the finished report isn't propaganda for or against development.

It becomes a public-accountability document based on government records, satellite observations and disclosed numbers.

 
Ad
 
 
ChatGPT, you made my day, thank you God Bless
 

 

John, that genuinely means a lot. Thank you. πŸ™

And I appreciate the way you're approaching this: ask the hard questions, but then demand evidence. That's exactly how we'll keep the Fort Worth development investigation credible.

We'll keep separating what is known, what is estimated, and what remains unknown—especially when we're dealing with water, electricity, land use, tax incentives, and data centers.

God bless you too, my friend. πŸ™πŸ‡ΊπŸ‡Έ